pre-installation manual for the GE Healthcare BrightSpeed CT Systems

This article is the pre-installation manual for the GE Healthcare BrightSpeed Elite, Edge, and Excel CT Systems which is written by sunrise company. It includes important precautions and warnings in various languages, emphasizing the need for understanding and following the instructions to avoid injury or harm.

When using GE Healthcare equipment, it is important to follow the instructions provided in the maintenance manual. Failure to adhere to the warnings in the manual can result in injury or other dangers. Do not operate the equipment without reading and understanding the instruction manual. Failure to do so may result in injury or danger. Service should not be performed without consulting and understanding the manual. Failure to follow this warning can result in injuries caused by electrical, mechanical, or other hazards. It is important to carefully examine packages for damage upon delivery and notify the carrier immediately if any damage is found.

All electrical installations should be performed by licensed electrical contractors. X-ray equipment should be properly used to prevent injury, and it is recommended to use protective materials or devices. Caution should be exercised when replacing lithium batteries to avoid explosions. Any omissions, errors, or defects in this publication should be reported. The revision history shows changes made to the manual.

In this revision history, various updates and additions were made to different sections and chapters of the BrightSpeed Elite, Edge, and Excel pre-installation manual. These include changes to system components, system operation, illustrations, noise levels, cooling requirements, room layouts, floor loading specifications, gantry and table mounting requirements, shipping considerations, power distribution systems, cables, fuse kits, and more. The manual also underwent general revisions and updates to meet European standards and compliance.

This document is a pre-installation guide for the GE Healthcare BrightSpeed Elite, Edge, and Excel systems. It includes various figures showing the setup and installation process for different components of the systems, such as the gantry, tables, and power distribution units. There are also tables providing information on system options, cooling requirements, and cable specifications.

information on the manufacturer’s system level siting requirements for the pre-installation of medical electrical equipment for electromagnetic compatibility includes details on meeting site ready requirements, quick installs, two-step and upgrade installs, site ready inspection visits, pre-installation checklists, dust/dirt and chemical contamination considerations, room planning, system catalog, regulatory and service clearances, recommended layouts, and environmental conditions such as temperature, humidity, cooling requirements, and electromagnetic interference. It also covers floor loading and weights, delivery and storage requirements.

The table of contents includes various sections such as floor protection, dollies, gantry considerations, table considerations, console considerations, storage requirements, extreme temperature transportation and deliveries, site environmental considerations, handling requirements, power requirements, interconnection data, and alternate cover removal options. The document provides detailed information and instructions for each section, including the responsibilities of the purchaser and the site readiness requirements.

Tile dust and wood sawdust or shaving can contaminate a CT scanner and decrease its reliability. Proper site preparation is necessary to ensure a clean environment for installation. This includes ensuring network connection, providing power supply, installing appropriate conduits, junction boxes, and support work, and meeting structural, HVAC, and electrical requirements. A site ready inspection visit is conducted to confirm that all requirements are met before installation. Quick installs with minimal room improvements are possible for sites that already meet certain requirements. In some cases, a two-step installation may be considered, but the room must still meet minimum requirements for the final CT system. The customer is responsible for ensuring all requirements are met.

detailed information about the requirements and checklist for the pre-installation of GE Healthcare equipment covers various aspects such as site preparation, room dimensions, equipment installation, power and grounding, and electromagnetic emissions and immunity. The checklist ensures that all necessary conditions are met before proceeding with the installation.

Sunrise company tried to emphasizes on the importance of maintaining a recommended separation distance between the system and portable or mobile RF communications equipment, based on the transmitter frequency. It states that field strengths from fixed RF transmitters should be below the compliance level in each frequency range. Equipment marked with a specific symbol may cause interference in its vicinity. The system’s normal operation should be observed, and appropriate measures should be taken if any abnormal performance is noticed. Guidelines for separation distances between portable and mobile RF communications equipment and the BrightSpeed System are provided. The use of accessories, transducers, and cables not specified may lead to degraded electromagnetic compatibility. Proper grounding and shielding of interconnect cables are necessary to minimize the risks of interference. The BrightSpeed System is intended for use in non-domestic environments and should be connected to a dedicated power supply system. It is advised to avoid stacking or placing the system adjacent to other equipment. The document also specifies requirements for low-frequency magnetic field, static magnetic field limits, and electrostatic discharge environment.

Before initiating the installation of the BrightSpeed systems, it is essential to ensure that all pre-installation requirements have been fulfilled. Site-specific items need to be verified, and construction sites should be avoided due to the potential for dust, dirt, and chemical contamination. The walls, ceiling, and flooring must be completed before installation can commence. Phone lines for optional modem use should also be installed. The gantry and table must be properly leveled and positioned according to the provided templates.

Furthermore, a list of system options requiring site planning work is provided. The base scanner system includes hardware and software for whole-body computed tomography. It is recommended to discuss room size dimensions and required system clearances with a GE Sales and Service Representative.

Figure 4-7 to Figure 4-16 in the document provide specifications for the installation of General Electric equipment, including the GE Healthcare BRIGHTSPEED CT Systems. These figures outline the required clearances and cable lengths for proper operation and safety. They offer detailed guidelines for the installation of various components and subsystems.

The document also includes recommended scan room and control room sizes, taking into account the necessary space for equipment and personnel. It provides guidance on meeting regulatory clearances based on U.S. federal regulations and national standards, as outlined in Figure 4-1. Minimum clearances for means of egress and electrical equipment are discussed to ensure compliance with safety regulations.

The minimum working clearances for different subsystems are specified, including the required clear space for service access to the console and the head clearance. Tables in the document outline the workspace requirements for each subsystem within a room, specifying the minimum clear space, additional conditions, and direction of service access. The dimensions for workspace, service access width, and head clearance are provided.

The document also explains the concept of a grounded wall and clarifies that conduits and floor outlet boxes are not considered grounded elements of a common wall. It introduces the CT Gantry Left Side Limited Access Initiative, which allows for a reduction in the minimum room size for CT systems while still meeting installation requirements. However, it notes that left-side access and egress may be restricted. Compliance with regulatory cautions and clearances is still necessary, and additional room components may impact compliance.

Different recommended, typical, and minimum room sizes are presented in the document, each with their own specifications. The document provides measurements and layouts for each room size, offering guidance on how to configure the space appropriately.

Furthermore, the clearances required for servicing the CT system, including the gantry and covers mentions that a single service engineer can perform servicing and highlights the importance of clear and unobstructed access to the gantry tube change area. The clearance requirements for the boom assembly and power distribution unit are also discussed. Additionally, the document introduces the concept of Short Footprint mode, which can be used in situations where the room length cannot meet the standard requirements, allowing for more flexibility in installation.

information on the minimum tension strength requirements for anchoring the table and gantry of the GE Healthcare system states that the distance from the anchor to the edge of the concrete basement should not be less than 178mm to maintain full tension strength. The responsibility for providing an approved support structure and mounting method rests with the purchaser. GE supplies anchors for mounting the table and gantry, but it is the customer’s responsibility to either use the GE-supplied anchoring method or provide an equivalent method.

Proper anchoring is essential for patient safety, and the document warns against improperly securing the table, as it may tip and dislodge the patient. It advises consulting with an architect, structural engineer, contractor, or PMI to address any questions or concerns regarding anchoring.

Additionally, the document includes information on floor loading and weights of various components in GE Healthcare’s BrightSpeed Elite, Edge, and Excel systems. It provides dimensions and center of gravity information for different patient tables and cradle extenders. Details about the power distribution unit and operator consoles are also provided.

delivery and storage requirements for the systems recommends preferred delivery methods such as dock-to-dock shipment and ground deliveries with lift-gate or tilt bed trucks. It cautions against lifting the subsystems by crane or other methods without consulting GE Engineering.

During the pre-installation process, it is crucial for the customer to approve the space requirements. To determine the suitable layout, a floor template with a ruler should be used to arrange the components. The distance between the cradle limitation and the wall should be measured and recorded. The layout must comply with regulatory and service clearance standards. It is also recommended to create an optimal operating environment that ensures the electronic components function properly and provides comfort for the operator. A storage cabinet is included for convenient service access. The dimensions of various components, such as the color printer and remote color monitor, are provided for reference.

Detailed information is provided regarding the dimensions and clearances of the BSD Elite system’s components. This includes the table, gantry, power distribution unit, operator’s console, and freedom workspace table. The minimum dimensions and clearances required for system operation are also specified, including the height of the injector control and the ceiling pedestal mount.

the structural requirements for installing GE Healthcare’s BrightSpeed CT scanner covers topics such as table and gantry mounting, floor anchors, floor strength, floor levelness, floor vibration, walls, ceilings, and network connections. The text emphasizes the importance of proper anchoring and support to ensure patient safety during system operation. It highlights the need for a solid and level floor to maintain alignment between the table and gantry. Customers are advised to consult with structural contractors and vibration consultants to ensure compliance with all specifications. The recommended dimensions for the patient viewing window and the weight requirement for the ceiling are also mentioned. Furthermore, the document specifies the network connection requirements for the CT system.

The text also provides comprehensive information and diagrams regarding network connections, room planning, radiation protection, and the patient environment for GE Healthcare’s BRIGHTSPEED ELITE, EDGE, and EXCEL scanners. It specifically covers rear panel ports and connections, the broadband process overview and responsibilities, radiation shielding requirements, scatter surveys, and the patient environment.

the environmental conditions necessary for proper functioning of the CT subsystems emphasizes maintaining specific temperature and humidity levels in both the scan room and control room to ensure system operation and image quality. The chapter provides guidelines for cooling requirements and addresses concerns related to electromagnetic interference (EMI). It offers recommendations for the placement of sensitive electronics and suggests measures to reduce EMI if required. Additionally, it mentions the use of an Uninterruptable Power Supply (UPS) to ensure a consistent power supply and specifies the recommended distance between the UPS and sensitive electronics.

The maximum ambient noise levels produced by the gantry during a CT scan acquisition should not exceed 75 dBA when measured at a distance of one meter from the nearest gantry surface. For the operator’s console, the maximum ambient noise levels should be equal to or less than 56 dBA when measured one meter up and one meter away from the console. The BrightSpeed system has a total floor load of approximately 2880 kg, with approximately 2310 kg concentrated in the table-gantry assembly. Anchoring of the table and gantry is required, while anchoring of the power distribution unit and console is optional. Wood, blacktop, or marble floors are not recommended, and concrete floors with a minimum thickness of 102 mm are preferred for anchoring.

Regarding the minimum tension strength requirements for anchoring the table and gantry of the GE Healthcare system, it is stated that the distance from the anchor to the edge of the concrete basement should be no less than 178 mm to maintain full tension strength. The responsibility for providing an approved support structure and mounting method lies with the purchaser. GE supplies anchors for mounting the table and gantry, but the customer can choose to use the GE-supplied anchoring method or provide an equivalent method. The text provides specifications for the GE-supplied anchors and offers information on floor loading and weights. Proper anchoring is emphasized to ensure patient safety and to prevent the table from tipping and dislodging the patient. Consulting with an architect, structural engineer, contractor, or PMI is recommended to address any questions or concerns. The text also includes anchor mounting requirements and instructions for installing the GE anchors.

Furthermore, information on the floor loading and weights of various components in GE Healthcare’s BrightSpeed Elite, Edge, and Excel systems includes dimensions and center of gravity information for different patient tables and cradle extenders. Details about the power distribution unit and operator consoles are also provided, along with delivery and storage requirements for the systems. The text advises preferred delivery methods, such as dock-to-dock shipment and ground deliveries with lift-gate or tilt bed trucks. It cautions against lifting the subsystems by crane or other methods without consulting GE Engineering.

 

Delivery and Placement:

The patient table should be lifted on its dollies and placed on a lifting platform, ensuring no contact with any GE Healthcare machinery.

If vertical or horizontal lifting is required, appropriate lifting fixtures must be included in the order.

Delivery through stairwells requires special considerations, and floor protection is recommended.

Dollies are used for moving the gantry, table, and console during domestic shipments within the United States.

Specific dollies, such as zero clearance dollies and tilting table dollies, are necessary for certain delivery situations.

The gantry is mounted on a pallet and lifted using dolly elevating casters.

Shipping dimensions for the table, console, gantry, and dollies are provided separately.

 

Shipping and Storage:

Dimensions for shipping and storage of different components are specified.

The console is shipped without the keyboard table installed, and dimensions are given for the console alone.

The NIO16 console is shipped without installed covers, and their dimensions are provided.

The OpenOC16 console is an open chassis without covers, with specified dimensions.

The power distribution unit (PDU) is shipped on a skid with specified dimensions.

Storage requirements for short term, construction-site, and long term storage are outlined, including temperature, humidity, and pressure specifications.

Extreme temperature transportation and delivery should be avoided.

The system is susceptible to dust, dirt, and chemical contamination, and specific installation requirements are given.

Handling requirements and precautions to prevent dropping, shocks, and vibrations are outlined.

 

Power and Connectivity:

Instructions for inclines and flat-bed truck removal to avoid tipping or lifting the gantry during movement are provided.

Power source configuration, rating, regulation, phase imbalance, sags, surges, transients, and grounding requirements are explained.

A dedicated feeder run from the facility’s main isolation transformer is recommended, along with a minimum transformer size.

System characteristics are mentioned.

 

Component Designators and Cabling:

A list of component designators is provided, including power distribution units, emergency off switches, slave monitors, warning lights, door interlock switches, and Ethernet transceivers.

Details about cables and wiring, such as lengths, ratings, and sizes, are given.

An extended cables kit for a specific system type is mentioned.

 

Interconnection and Wiring:

Recommended cables and components for installation are described, including power supply cables, in-suite telephone lines, broadband network connections, and fuse kits.

Conduit requirements between various components are mentioned.

Options for partial UPS backup are provided in a table.

 

Pre-Installation Interconnection Data:

Information on typical customer supplied wiring, primary power disconnects, scan room warning lights and door interlocks, and recommended power distribution systems for Europe is provided.

Appendix includes alternate cover removal options for different room configurations.

 

Space Requirements:

The minimum space requirement for servicing the system is 914 mm (36 in) without voltage panels or surface mounted ducts/conduits.

If the system faces a grounded surface or wall, the requirement increases to 1067 mm (42 in).

If the system faces a surface or wall with live voltage panels, surface mounted ducts, or conduits, the minimum space requirement is 1219 mm (48 in).

 

Share the Post:

Table of Contents

Related Posts

Exploring the Landscape of CT Machine Manufacturers

Exploring the Landscape of CT Machine Manufacturers

Computed Tomography (CT) machines are indispensable diagnostic tools used in medical imaging for visualizing internal structures and detecting abnormalities with precision. The market for CT machines is diverse and dynamic, with several prominent manufacturers driving innovation, competition, and market growth. In this comprehensive analysis, we delve into the landscape of CT machine manufacturers, examining leading companies, their product offerings, industry

Read More
Exploring the Top-Rated MRI Machines

Exploring the Top-Rated MRI Machines

Magnetic Resonance Imaging (MRI) machines are indispensable tools in modern medicine, offering non-invasive, high-resolution imaging capabilities for diagnosing a wide range of medical conditions. With advancements in technology, MRI machines have evolved to provide superior image quality, faster scan times, and enhanced patient comfort. In this comprehensive analysis, we delve into the top-rated MRI machines, examining their innovations, applications, clinical

Read More

Join Our Newsletter